Shiny copper pipes for the internal brewhouse water supply and tank refrigeration system which are being installed all around the walls at high level.
The new grist case awaiting some modifications to increase its capacity to 1 tonne of malt grist - basically an extra strip of stainless steel (316 for the technical) 300mm wide welded onto the sides.
I'll keep you posted with any updates in the new brewery, but certainly at the moment it's very exciting.
Cheerio for now, Ken